The Ministry had indicated at the prior renewal cycle that future permit approvals would be conditional on the firm demonstrating progress on skills transfer and active efforts ...
All eight permits renewed. The Ministry acknowledged the quality of the skills transfer documentation and issued renewals with a 24-month validity rather than the 12-month renewals previously issued. Two Namibian engineers were recruited into the firm within three months of the renewal, strengthening the firm's localisation position for the next renewal cycle.
A German-owned engineering and project management firm that had secured long-term contracts with two Namibian parastatals and employed eight foreign engineers in roles that the Ministry of Home Affairs had flagged as requiring demonstrable localisation effort at permit renewal.
The Ministry had indicated at the prior renewal cycle that future permit approvals would be conditional on the firm demonstrating progress on skills transfer and active efforts to recruit Namibian engineers into the roles over time. The firm's permits were due for renewal in four months and the company's HR team had produced no documentation to satisfy this requirement. The risk of permit refusal would have halted active infrastructure projects.
We assessed the Ministry's localisation requirements and prepared a formal skills transfer plan for each of the eight roles, documenting the training being provided to Namibian counterparts, the competencies being transferred, and the realistic timeline for local replacement in each function. We identified two roles where local candidates with the required qualifications existed in the market and advised the company to initiate recruitment as a demonstration of good faith alongside the permit renewal. We prepared the full permit renewal packages with the skills transfer plans attached and liaised directly with the Ministry throughout the review.
All eight permits renewed. The Ministry acknowledged the quality of the skills transfer documentation and issued renewals with a 24-month validity rather than the 12-month renewals previously issued. Two Namibian engineers were recruited into the firm within three months of the renewal, strengthening the firm's localisation position for the next renewal cycle.
Additional case studies connected by sector or service line.
The company had been managing PAYE deductions using a spreadsheet last updated in 2019.
Energy & RenewablesThe individual had been on assignment in Namibia for seven months and had not determined his Namibian tax residency position.
Energy & RenewablesThe company had never operated in Namibia and had no understanding of the local registration process.